综采工作面快速过断层方案设计及应用实践 被引量:1

Scheme Design and Application Practice of Rapid Fault Crossing in Fully Mechanized Mining Face
下载PDF
导出
摘要 以某矿6271综采工作面过F102、F113断层为工程背景,提出在回采巷道内对断层影响区进行注浆加固方案,以提高煤岩体强度,同时依据采面、断层现场实际情况制定过断层技术方案以及安全措施。现场应用后,6271综采工作面过断层期间仍可保持4.0 m/d的推进速度,同时综采设备保持稳定,顶板及煤壁未出现冒顶、片帮等问题,采面实现了安全、快速过断层。 Based on the engineering background of 6271 fully mechanized mining face of a mine passing through faults F102 and F113,it is proposed to strengthen the fault affected area in the mining roadway by grouting to improve the strength of coal and rock mass.At the same time,the technical scheme and safety measures for passing through faults are formulated according to the actual situation of the mining face and fault site.After field application,the advancing speed of 4.0 m/d can still be maintained during the fault crossing of 6271fully mechanized mining face,while the fully mechanized mining equipment remains stable,and the roof and coal wall have no roof fall,caving and other problems,and the mining face has achieved safe and rapid fault crossing.
作者 梁震 Liang Zhen(Shanxi Fenxi Ruitai Zhengzhong Coal Industry Co.,Ltd.,Lingshi Shanxi 031300)
出处 《山西冶金》 CAS 2022年第5期140-141,共2页 Shanxi Metallurgy
关键词 综采工作面 断层 安全生产 加固技术 破碎带 fully mechanized face faults safe production reinforcement technology crushing zone
  • 相关文献

参考文献7

二级参考文献40

共引文献70

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部