期刊文献+

综放工作面过构造区破碎带注浆加固技术的应用 被引量:5

Fully Mechanized Caving Face Crossing Tectonic Region Fracture Zone Grouting Reinforcement Technology Application
下载PDF
导出
摘要 针对综采放顶煤工作面构造区破碎带片帮冒顶等问题,通过采用超前注浆加固破碎带煤岩体顶帮技术,确保工作面割煤、移架、放顶煤等主要工艺的正常安全进行。实践表明,该方法有效地防止了架前片帮和冒顶,减少了煤炭损失,取得了良好的技术经济效果,为类型情况提供经验借鉴。 Based on fully mechanized caving top coal working face tectonic region fracture zone rib and roof fall problems, through the adoption of advanced grouting reinforcement fracture zone coal and rock jecking technology, ensured the safety and normal of coal cut, moving frame, caving and other technology. The practice showed that the technology effectively prevented the rib and roof fall, reduced the coal loss, achieved good technical and economic results and provided experience and reference for similar conditions.
作者 李林瑞
机构地区 阳泉固庄煤矿
出处 《煤炭与化工》 CAS 2014年第7期88-90,共3页 Coal and Chemical Industry
关键词 综采放顶煤 构造区破碎带 注浆加固 技术经济效果 hilly mechanized caving tectonic fracture zone grouting reinforcement technical and economic effect
  • 相关文献

参考文献5

二级参考文献7

共引文献61

同被引文献26

引证文献5

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部