摘要
为了使6109综采工作面顺利地通过断层,结合煤层赋存、顶底板情况以及地质构造等现场资料,采取了挑顶飘底的方式过断层,制定工作面过断层技术方案,取得较好效果,可为类似条件下的工作面过断层提供参考。
In order to make 6109 fully mechanized working face pass through fault smoothly,combined with the field data of coal seam occurrence,roof and floor conditions and geological structure,the way of lifting the top and floating the bottom is adopted to pass through fault,and the technical scheme of working face passing through fault is formulated,which has achieved good results,and can provide reference for working face passing through fault under similar conditions.
作者
陈鹏
尚培久
Chen Peng;Shang Peijiu(Shuozhou Vocational and Technical College,Shanxi Shuozhou 036002;Shanxi Shanyin Shaoyaohua Coal Industry,Shanxi Shuozhou 036900)
出处
《山东煤炭科技》
2021年第5期73-74,77,共3页
Shandong Coal Science and Technology
关键词
综采
断层
措施
fully mechanized mining
fault
measures