期刊文献+

综掘工作面通风除尘技术研究 被引量:5

Study on ventilation and dust removal technology of heading working face
下载PDF
导出
摘要 针对镇城底矿22605综掘工作面压入式通风过程中煤尘大的现状,将压入式通风方法优化为混合式通风方法,利用ANSYS数值模拟软件和现场试验结合的方式,对长压短抽通风方式下风筒的位置进行了确定,得到下压风筒距离掘进面4 m,抽风筒距离掘进工作面25 m是最佳的通风距离,除尘效率达到88.47%,有效降低了综掘过程中煤尘的浓度,保证了掘进工作的安全进行。 In view of the current situation of large coal dust in the process of pressing ventilation of 22605 fully mechanized working face in Zhenchengdi Mine,the press-in ventilation method was optimized into a hybrid ventilation method.Software ANSYS numerical simulation and field test were adopted,it was concluded that the best ventilation distance was the air duct 25 m away from the heading face and the distance between the downward air duct and the heading face 4 m,with the dust removal efficiency 88.47%,which effectively reduced the concentration of coal dust and safe mining.
作者 韦山 Wei Shan(Zhenchengdi Mine,Xishan Coal and Electric Group Corporation Ltd.,Taiyuan 030053,China)
出处 《煤炭与化工》 CAS 2021年第4期112-114,共3页 Coal and Chemical Industry
关键词 综掘工作面 ANSYS数值模拟 长压短抽 通风除尘 fully mechanized working face ANSYS numerical simulation long pressure and short extraction ventilation and dust removal
  • 相关文献

参考文献10

二级参考文献40

共引文献121

同被引文献62

引证文献5

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部