4HITONARI F, TETSUYA N, MASAYOSHI I. URUP(ultra rapid under pass) method---the first shield tunneling method for launching and arrival at the ground level[C]// World Tunneling Congress. Budapest, Hungary: ITA, 2009: 112-116. 被引量:1
5TUDOKA T. Construction of M.R.T. Chaloem Ratchamongkhon line underground structures north and Japanese shield Umnel technology[C]//International Symposium on Underground Excavation and Tunneling. Bangkok: [s. n.], 2006:99 - 130. 被引量:1
8NOMOTO T, IMAMURA S, HAGIWARA T, et al. Shield tunnel consl/'uction in cllrifuge[J]. Journal of Gcotechnical and G-eoenvironmental Engineering, 1999, 125(4): 289- 300. 被引量:1
9BRASSINGA H E, BEZUIJEN A. Modelling the grouting process around a tunnel lining in a geotechnical centr!fuge[C]//Proceedings of the Fitteenth International Conference on Soil Mechanics and Geotechnical Engineering. [S. 1.]: Is. n.], 2001 : 1 455 - 1 458. 被引量:1
10HASHIMOTO T, KONDA T, BRINKMAN J, et al. Simultaneous backfill grouting, pressure development in construction phase in the long-term[C]//Proceedings of The 30th ITA - A ITES World Tunnel Congress. Singapore: [s.n.], 2004:52 - 59. 被引量:1