随着近年来地下空间工程的大规模兴建,越来越多的城市轨道交通工程、市政工程等采用盾构技术施工,特别是在黏性土掘进过程中,泥饼的预防和治理是现场亟待解决的问题之一。以衡阳二环东路合江套湘江隧道为背景,通过掌子面原状土电镜试验和掘进参数正交试验,揭示了泥水盾构江底掘进中刀盘泥饼的形成机理,奠定了泥饼防治的理论基础,研究成果解决了现场实际问题。
With the large-scale construction of underground engineering in recent years,the shield tunneling technology was used more and more universally in city rail traffic and municipal engineering.Especially,the prevention and control method of mud cake is one of the problems which need to be solved in clay layer excavation process.Based on Hejiang-Xiangjiang Tunnel,which is the control engineering in eastern road of Hengyang Second Ring,this paper tries to reveal the forming mechanism of mud cake in tunneling process of slurry shield by electron microscopy test and orthogonal test.All in all,this paper makes a theoretical foundation of mud cake treatment.
作者
于勇
傅鹤林
史越
李小利
陈俐光
田辉
YU Yong;FU Helin;SHI Yue;LI Xiaoli;CHEN Liguang;TIAN Hui(China Railway Sixth Survey and Design Institute Group Co.,Ltd.,Tianjin 300308,China;School of Civil Engineering,Central South University,Changsha,Hu'nan 410075,China;China Construction Municipal Engineering Co.,Ltd.,Beijing 100071,China)
出处
《施工技术》
CAS
2019年第5期105-109,共5页
Construction Technology
基金
国家自然科学基金(51578550
51538009)
中建股份科技研发计划项目(CSCEC-2016-Z-24)
关键词
隧道工程
盾构
泥水盾构
泥饼
电镜试验
正交试验
机理
tunnels
shields
slurry shields
mud cake
electron microscopy test
orthogonal test
mechanisms