摘要
复合地层盾构掘进中,盾构机刀盘结泥饼的现象是城市地铁隧道施工中的一个难题。文章以广州地铁四号线某区间隧道工程为例,从地层地质、盾构机自身设计制造及施工控制等因素对刀盘结泥饼的原因进行了分析,提出了防治泥饼的施工措施,为类似工程提供了解决此类问题的思路和途径。
Clay cakes may become a big challenge for which an example on Guangzhou Metro line 4 is when shield machine excavates in the mixed strata condition, presented. This article analyzes the reasons for the occurrence of clay cakes from geotechnical conditions ; design and manufacture of the shield machine and construction control ; and then puts forward the guidance to prevent the clay cakes and countermeasures against them for similar projects.
出处
《现代隧道技术》
EI
北大核心
2007年第4期24-27,35,共5页
Modern Tunnelling Technology
关键词
盾构隧道
刀盘
泥饼
防治措施
Shield tunneling
Cutters and cutter head
Clay cake
Prevention and countermeasures