异步距异节奏流水施工组织方法研究 被引量:4

Research on Flow Construction Organization Method with Different Pace and Different Rhythm
下载PDF
导出
摘要 首先介绍了异步距异节奏流水施工的特点,提出多个施工层异步距异节奏流水施工的组织方法,得到流水施工工期计算公式,并通过3个具体实例加以详细说明,对《工程项目组织与管理》、《土木工程施工组织》等课程建设起到一定的促进作用。 The characteristics of flow construction with different pace and different rhythm are firstly introduced.An organization method was proposed which allows multiple floors to be constructed in flow construction with different pace and different rhythm,and the equation was provided to calculate the construction period.Its application was illustrated in detail with three examples.This work helps to improve the courses of construction organization and management,construction organization for civil engineering,etc.
出处 《施工技术》 CAS 北大核心 2013年第10期105-107,共3页 Construction Technology
基金 河北建筑工程学院教学研究项目(JY110406)
关键词 项目管理 流水施工 异步距 异节奏 组织方法 project management different pace flow construction different rhythm construction organization
  • 相关文献

参考文献7

二级参考文献4

共引文献7

同被引文献18

引证文献4

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部