摘要
重大国家会议场馆工程因其特有的高标准、短工期对项目施工提出了更高要求,而BIM+装配式施工技术正是解决此类问题的关键。以青岛国际会议中心项目为例,从钢结构、精装修、机房安装等多角度详细阐述了BIM+装配式施工技术在工程建设中的应用。通过技术引领,保证了施工质量,达到了预期目标。
High standard,short time limit for major national conference venues put forward higher requirements for project construction.BIM+prefabricated construction technology is the key to solve these problems.Taking Qingdao International Conference Center project as an example,the application of BIM+prefabricated construction technology in engineering construction is elaborated from the perspectives of steel structure,fine decoration and machine room installation.Through technical guidance,the construction quality is guaranteed and the expected goal is achieved.
作者
周可璋
卢宁
刘天宇
李晓明
黄运昌
ZHOU Kezhang;LU Ning;LIU Tianyu;LI Xiaoming;HUANG Yunchang(The Fourth Construction Co.,Ltd.of China Construction Eighth Engineering Division Co.,Ltd.,Qingdao,Shandong 266071,China)
出处
《施工技术》
CAS
2020年第16期28-30,35,共4页
Construction Technology
关键词
会议场馆
装配式
建筑信息模型
三维扫描
钢结构
安装
conference venues
prefabricated
building information modeling(BIM)
3D scanning
steel structures
installation