北京地铁6号线西延工程西黄村车站为PBA工法车站,其顶纵梁施工中以初支基面、防水、混凝土、施工缝及二衬背后回填注浆等为重点;在交底、报验、检测、质量过程控制等方面总结了现场管控要点.
West Huangcun station project along the west extending Beijing subway line 6 used PBA construction method and important construction aspects in the roof longitudinal beam construction included initial support base,waterproof,concrete,construction joint and secondary lining backfill grouting.The key control points on construction site were summarized,such as disclosure,acceptance application,inspection and quality process control,etc.