摘要
半潜平台组块与船体的合拢方案主要有2种,一种是利用浮吊船进行海上吊装合拢,另一种是利用船坞及龙门吊进行陆上吊装合拢。本文以一座基于龙门吊吊装合拢的半潜平台组块作为研究对象,开展组块吊装分析方法的研究。对比3种不同吊装模拟方式的差异,并给出推荐的吊装分析方法。
There are two main ways to integrate the topsides and hull for semi-submersible platform. One is to use the floating crane to carry out the integration offshore,and the other is to use the dock and the gantry crane to carry out the integration on dry dock. The topsides lifting process and analysis method of a Semi-submersible platform based on gantry crane is studied in this paper.By comparing three different lifting simulation methods,this paper and give the recommended method.
作者
王朝阳
文志飞
赵阔
薄景富
Wang Zhaoyang;Wen Zhifei;Zhao Kuo;Bo Jingfu(CNOOC Research Institute Ltd.,Beijing,100028)
出处
《石化技术》
CAS
2019年第2期20-21,24,共3页
Petrochemical Industry Technology
关键词
半潜式平台
龙门吊
组块
吊装分析
semi-submersible platform
gantry crane
topsides
lifting analysis