期刊文献+

MIS开发项目进度管理的关键链识别研究 被引量:4

Study on Critical Chain Recognition in Schedule Management of MIS Development Project
下载PDF
导出
摘要 在分析管理信息系统开发项目具备较高复杂性和多变性的基础上,引入关键链建立项目进度管理关键链识别模型,对关键路径进行优化,并识别信息系统开发项目中的关键链。在模型求解上,对比传统资源调配法提出改进的方法解决信息系统开发项目中的关键链识别问题,改善传统信息系统项目进度管理,提高项目开发的成功率。最后通过算例分析说明模型的实用性。 On the basis of analyzing the high complexity and variability of development projects in management informa-tion system,critical chain is introduced;the critical chain recognition model in schedule management is established.It is beneficial to optimize the critical path and identify the critical chain in the development projects of information system.In solving the model,the improved method by comparing the traditional resource allocation method is proposed to solve the problem of the development projects in critical chain recognition.It ameliorates the traditional schedule management about information system management,and improves the success rate of project development.Finally,the model shows the practicability through the analysis of the example.
出处 《科技管理研究》 CSSCI 北大核心 2014年第19期177-180,194,共5页 Science and Technology Management Research
基金 广西壮族自治区社会科学项目"项目管理在MIS开发中的应用研究"(2011105951201M42)
关键词 信息系统开发项目 关键链识别 资源调配法 进度管理 development projects of information system critical chain recognition resource allocation method schedule management
  • 相关文献

参考文献8

  • 1LI WARREN.CHAOS Report[DB/OL].http://dontrush.org/blog/2010-01/chaos-report. 被引量:1
  • 2STEYN H.An investigation into the fundamentals of critical chain project scheduling[J].International Journal of Project Management,2000(19):363-369. 被引量:1
  • 3HERROELEN W,LEUS R.On the merits and pitfalls of critical chain scheduling[J].Journal of Operations Management,2001(19):559-577. 被引量:1
  • 4LONG LUONGDUC,OHSATO A.Fuzzy critical chain method for project scheduling under resource constraints and uncertainty[J].International Journal of Project Management,2008(26):688-698. 被引量:1
  • 5田文迪,崔南方.关键链项目管理中关键链和非关键链的识别[J].工业工程与管理,2009,14(2):88-93. 被引量:30
  • 6施骞,龚婷.基于GERTs的随机网络计划关键链识别方法[J].系统工程理论与实践,2012,32(7):1531-1536. 被引量:7
  • 7LONG LUONG DUC,OHSATO A.Resource-constrained project scheduling:A survey of recent developments[J].Computers&Ops Res,1998,25(4):279-281. 被引量:1
  • 8陈琼妮..基于关键链技术的项目进度管理的研究[D].重庆大学,2011:

二级参考文献22

  • 1邬晓光,李俊升,冯祁.桥梁施工进度控制GERT网络仿真研究[J].中国公路学报,2004,17(3):108-111. 被引量:6
  • 2刘士新,宋健海,唐加福.资源受限项目调度中缓冲区的设定方法[J].系统工程学报,2006,21(4):381-386. 被引量:70
  • 3Goldratt E. Critical Chain[M]. The North River Press, Great Barrington, 1997. 被引量:1
  • 4Mabin V J, Balderstone S J. The world of the theory of constraints: A review of the international literature [M]. APICS series on Constraints Management. New York: StLucie Press, 2000. 被引量:1
  • 5Leach L P. Critical chain project management improves project performance[J]. Project Management Journal, 1999, 30 (2) : 39-51. 被引量:1
  • 6Herroelen W, Leus R. On the merits and pitfalls of critical chain scheduling[J]. Journal of Operations Management, 2001, 19(5) ,559-577. 被引量:1
  • 7Yeo K T,Ning J H. Integrating supply chain and critical chain concepts in engineer-procure-construct (EPC) projects [J]. International Journal of Project Management, 2002, 20 (4) : 253-262. 被引量:1
  • 8Wei C C, Liu P H, Tsai Y C. Resource-constrained project management using enhanced theory of constraint[J ]. International Journal of Project Management, 2002, 20: 561-567. 被引量:1
  • 9Newbold R C. Project Management in the Fast Lane- Applying the Theory of Constraints[M]. The St. Lucie Press, Boca Raton, 1998. 被引量:1
  • 10Leach L P. Critical Chain Project Management [M]. Artech House, 2000. 被引量:1

共引文献33

同被引文献22

引证文献4

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部