基于多资源约束和活动调整优先级的关键链识别方法研究 被引量:4

Research on Identification of Critical Chain under Multi-resource Constraints and Activities Precedence Relations
原文传递
导出
摘要 针对多资源约束项目,提出一种考虑活动调整优先关系的关键链识别改进方法.采用灰色关联分析方法综合考虑活动的资源影响程度、活动的持续时间和紧后活动链持续时间确定活动调整的优先级.结合"多化单"识别方法与通用识别流程识别关键链,当存在资源冲突时,在满足活动时间约束关系的前提下,依据活动调整优先级调整活动执行顺序,生成满足所有资源约束的积极的和延迟的进度计划,从而确定关键链.通过算例展示了改进方法的应用过程,验证了改进方法的可靠性与合理性. Proposed an improved method of identification of critical chain considering the precedence relations under multi-resource constraints. Considering the activity resource requirements, the duration of the activity and the duration of predecessor activities, use grey relational analysis method to calculate the priority of each activity. Considering one resource constraint as well as the logical relationship between activities, generate the initial scheduling plan. According to the principle of priority to rearrange the sequence of activities to generate positive and delayed scheduling which has no multi-resource conflict. The activities which cannot move in the scheduling plan are the critical activities, and the activities chain is the critical chain. A numerical example shows the process of using the improved method to identify the critical chain, and the critical chain schedule is feasible.
出处 《数学的实践与认识》 北大核心 2015年第23期48-56,共9页 Mathematics in Practice and Theory
基金 国家自然科学基金(71271019 71271014)
关键词 关键链识别 活动优先级 灰色关联分析 关键链技术 identification of critical chain activity precedence relations grey relational analysis critical chain method
  • 相关文献

参考文献23

  • 1Goldratt E M, Cox J. The Goal: A Process of Ongoing hnprovement[M]. South Africa: National Productivity Institute, 1992. 被引量:1
  • 2Steyn H. Project management applications of the theory of constraints beyond critical chain schedul- ing[J]. International Journal of Project Management, 2002, 20(1): 75-80. 被引量:1
  • 3Bevilacqua M, Ciarapica F E, Giacchetta G. Critical chain and risk analysis applied to high-risk industry maintenance: A case study[J]. International Journal of Project Management, 2009, 27(4): 419-432. 被引量:1
  • 4Barber P, Tomkins C. Graves A. Decentralized site management: a case study[J]. The International Journal of Project Management, 1999, 17(2): 113-120. 被引量:1
  • 5Herroelen W S, Leus R. On the merits and pitfalls of critical chain scheduling [J]. Journal of Operations Management, 2001, 19(5): 559-577. 被引量:1
  • 6Brucker P, Drexl A, Mohring H, Neumann K, Peach E. Resource-Constrained project scheduling: Notation, classification models and methods[J]. European Journal of Operation Research, 1999, 112(1): 3-41. 被引量:1
  • 7Tukel O I, Rom W O, Eksioglu SD. An investigation of buffer sizing techniques in critical chain scheduling[J]. European Journal of Operational Research, 2006,172 (2):401-416. 被引量:1
  • 8Rabbani M. A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept[J]. European Journal of Operational Research, 2007, 176(2): 794-808. 被引量:1
  • 9Peng W L, Xu H. The Scheduling Problem of Active Critical Chain Method[J]. Information Tech- nology Journal, 2012, 11(7): 829-839. 被引量:1
  • 10王雪青,郭留洋,符桃.基于关键链技术的工程项目进度规划问题研究[J].河北工业大学学报,2005,34(6):20-23. 被引量:27

二级参考文献95

共引文献128

同被引文献25

引证文献4

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部