期刊文献+

基于分支定界法的关键链项目计划重排 被引量:5

Rescheduling based on branch-and-bound in critical chain project scheduling
下载PDF
导出
摘要 通过举例说明在关键链项目计划中插入输入缓冲后,可能出现资源冲突和紧前关系冲突。从局部和全局两个方面采用分支定界法对项目计划进行重排来解决冲突问题。通过举例说明基于分支定界法的计划重排算法是有效和可行的。通过模拟仿真,从三个不同层次分析项目活动任务的不确定性对项目完工率和项目惩罚成本的影响。结果显示,保留原始关键链的基于分支定界法的全局性关键链计划重排方法较之其他方法要好,不确定性更低,项目的完工率更高,项目的惩罚成本更低。 There are some resource conflicts and precedence conflicts that might be happened after inserting feeding buffer in the critical chain scheduling/buffer management.These conflicts could be solved by using the branch-and-bound rescheduling algorithms which included both global and local rescheduling.Finally,it designed some simulations to evaluate the impact of three different levels of activity uncertainty on the project completion rate and stability cost.The computational results indicate that the critical chain rescheduling based on global branch and bound which keeps the original critical chain is the best among all.Besides,the lower the uncertainty,the higher the timely completion probability and the lower the stability cost.
出处 《计算机应用研究》 CSCD 北大核心 2011年第11期4035-4039,4048,共6页 Application Research of Computers
基金 国家自然科学基金资助项目(61070235)
关键词 关键链项目管理 分支定界法 项目计划重排 critical chain scheduling/buffer management(CC/BM) branch-and-bound project rescheduling
  • 相关文献

参考文献24

  • 1GOLDRATT E M. Critical chain [ M ]. [ S. l. ] : North River Press, 1997. 被引量:1
  • 2NEWBOLD R C. Project management in the fast lane: applying the theory of constraints[ M]. [ S.l. ] :St Lucie Press, 1998. 被引量:1
  • 3LEACH L P. Critical chain project managers' field book[ M]. 1999. 被引量:1
  • 4LEACH L P. Critical chain project management[ M]. [ S. l. ] :Artech House Inc, 2005. 被引量:1
  • 5HUTCHIN T. Enterprise-focus management : changing the face of project management[ n]. [S. l. ] :Thomas Telford Pub, 2001. 被引量:1
  • 6KENDALL G, ROLLINS S C. Advanced project portfolio management and the PMO : multiplying ROI at warp speed [ M ]. [ S.l. ] : J. Ross Publishing, 2003. 被引量:1
  • 7WOEPPEL M J. Projects in less time: a synopsis of critical chain [ M ]. [ S. l. ] : Pinnacle Strategies Pub, 2006. 被引量:1
  • 8PATRICK S F. Critical chain scheduling and buffer management, getting out from between Parkinson ' s rock and Murphy ' s hard place [ EB/OL]. (1998), http ://www. focusedperformance, com. 被引量:1
  • 9RAND G K. Critical chain: the theory of constraints applied to project management [ J ]. International ,Journal of Project Management,2002,18(3) :173-177. 被引量:1
  • 10HERROELEN W, LEUS R. On the merits and pitfalls of critical chain scheduling [ J ]. Journal of Operational Management,2001, 19(5) :559-577. 被引量:1

二级参考文献54

共引文献216

同被引文献44

引证文献5

二级引证文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部