摘要
本文在对前人提出的关键链缓冲区设置的基础上,针对已有关键链缓冲管理在应用中存在的问题,提出利用三点时间估计中的最可能时间确定关键链,并通过位置权数和弹性系数来估算时间缓冲量的新方法,从而有效提高缓冲机制的监控和管理能力。
Based on previous proposed critical chain buffer settings, aiming at the existing problems of current critical chain buffer management in the application, this paper proposes a new method which uses the most likely time in the three-point estimation to determine the critical chain, and through the position weight and elasticity co-efficient to estimate the amount of time buffer, thus to effectively improve the capacities of monitoring and manag-ing buffer mechanisms.
出处
《科技广场》
2014年第11期32-35,共4页
Science Mosaic
关键词
项目管理
关键链缓冲区
项目进度计划与控制
MIS开发
Project Management
Critical Chain(CC)Buffer
Project Planning and Controlling
Management Information System Development