摘要
以西山煤电集团镇城底矿储煤筒仓工程为例,介绍了大直径筒仓中心井架环式辐射操作平台液压滑模施工技术。针对大直径筒仓工程特点,对现有滑模施工工艺进行了改进,使其既满足筒仓滑模施工操作要求,又解决了仓顶结构施工难题。
In this paper, Xishan coal and electricity group Zhenchengdi mine coal storage silo projects for instance, describes the construction technique of large-diameter silo center ring radiation derrick platform hydraulic slipform. For large-diameter silo engineering characteristics of the existing sliding construction process has been improved to not only meet the operating requirements silo slipform construction, but also to solve the warehouse roof structure construction problems.
出处
《山西建筑》
2011年第29期98-100,共3页
Shanxi Architecture
关键词
大直径筒仓
中心井架
环式平台
滑模施工
large-diameter silo, center derrick, ring platform, slip-form construction