期刊文献+

订单生产制造企业承诺交货期决策研究 被引量:3

Make-to-order Manufacturer's Promised Delivery-time Decision
原文传递
导出
摘要 交货期决策对订单生产企业极其关键,研究考虑需求对价格和交货期敏感的市场中,建立了订单生产制造企业交货期决策模型,最优化分析显示存在最优的承诺交货期使企业边际收益达到最大化,并在优化结果的基础上探讨了模型成本参数变化和市场需求敏感性对承诺交货期决策的影响,通过数值算例进一步分析了模型变量对承诺交货期决策的综合作用。 Delivery-time decision is crucial for make-to-order manufacturers.This paper formulates a model based on both time and price-sensitive demand with the aim of maximum of expected marginal profit,conducts the optimal analysis,which shows that there exists the optimal promised delivery time making enterprise marginal retums maximize.Based on the optimization result,it also discusses the effects of parameter changes of the model cost and market demand sensitivity on promised delivery time decision-making.Through numerical examples,further discussion is made on the comprehensive influence of model parameters on promised delivery time decision.The research findings provide useful guidance for enterprise's decision-making on promised delivery time.
作者 倪卫涛 周晶
出处 《系统工程》 CSSCI CSCD 北大核心 2014年第8期127-131,共5页 Systems Engineering
基金 国家自然科学基金资助项目(70831002)
关键词 订单生产 制造业 承诺交货期 决策模型 MTO Manufacturing Promised Delivery Time Decision Model
  • 相关文献

参考文献6

二级参考文献20

  • 1杨文胜,李莉.响应时间不确定下的交货期相关定价研究[J].中国管理科学,2005,13(2):56-62. 被引量:26
  • 2Wisner J D,et al.A survey of us manufacturingpractices in make-to-order machine shops[J].Production and Inventory Management Journal.1995,36(1):1~7. 被引量:1
  • 3Duenyas I.Single facility due date setting withmultiple customer classes[J].ManagementScience,1995,41(4):608~619. 被引量:1
  • 4Duenyas I,Hopp W.Quoting customer lead times[J].Management Science,1995,41(1):43~57. 被引量:1
  • 5Keskinocak P,Ravi R,Tayur S.Scheduling andreliable lead-time quotation for orders withavailability intervals and lead-time sensitiverevenues[J].Management Science,2001,47(2):264~279. 被引量:1
  • 6Ho,Zheng.Setting customer expectation in servicedelivery[J].Management Science,2004,50(4):479~488. 被引量:1
  • 7Shang,Liu.Promised delivery time and capacitygames in time-based competition[J].ManagementScience,2011,57(3):599~610. 被引量:1
  • 8Shanthikumar J G,Sumita U.Approximations forthe time spent in a dynamic job shop withapplications to due date assignment[J].International Journal of Production Research,1988,26(8):1329~1352. 被引量:1
  • 9Karmarkar U.Manufacturing lead times,orderrelease and capacity loading[C] //Graves S,et al.Handbooks in Operations Research andManagement Science,Vol.4,Logistics ofProduction and Inventory.Amsterdam:North-Holland,1993. 被引量:1
  • 10McFadden,Daniel.Conditional logit analysis ofqualitative choice behavior[M].Frontiers inEconometrics,New York:Academic Press,1974:105~142. 被引量:1

共引文献20

同被引文献32

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部