期刊文献+

基于承诺交货期与价格的通用件库存模型 被引量:3

A Study on Component Commonality Inventory Model with Guaranteed Delivery Time and Price
原文传递
导出
摘要 在对现有文献研究的基础上,从最基本的通用件库存模型出发,引入承诺交货期-价格因素,建立相应的通用件库存模型,研究承诺交货期与产品价格对通用件策略实施效果的影响。通过对无通用件模型、单通用件模型和双通用件模型的比较研究和算例分析,分析了通用件的成本结构对总利润的影响,并且分析了通用件采购成本、单位库存量持有成本以及单位制造费用对于交货期的敏感度在各种情况下对于通用件策略实施效果的影响。分析结论可为企业在各种不同情况的库存策略决策提供有益的指导。 This paper establishes the corresponding inventory model of component commonality by introducing the factors of guaranteed delivery time and price, and then it studies the influence of guaranteed delivery time and price of the product on the effect of component commonality strategy. Through the comparison between component commonality model and non-component commonality model,the effect of component cost structure on total profit is studieck In addition, it studies the influences of purchasing cost of component commonality, the sensitiv/ty of the unit manufacturing cost on the delivery and unit holding cost on component commonality strategy. These results are helpful for the decision-making of inventory strategy in the firm under different conditions.
出处 《工业工程与管理》 北大核心 2009年第5期14-19,30,共7页 Industrial Engineering and Management
基金 国家自然科学基金资助项目(70502015)
关键词 承诺交货期 价格 通用件 库存模型 guaranteed delivery time price component commonality inventory model
  • 相关文献

参考文献7

  • 1Blackburn J. Time Based Competition[M]. Illinois: Homewood, 1991: 1-2. 被引量:1
  • 2So K C,Song J S. Price, delivery time guarantees and capacity selection[J]. European Journal of Operational Research, 1998, 111:28-49. 被引量:1
  • 3Eliashberg J, Steinberg R. Marketing-production joint decision making [ J ]. The Netherlands: Handbooks in Operations Research and Management Science, 1993,18(5):827-877. 被引量:1
  • 4Pertruzzi N C, Dada M. Pricing and the newsvendor problem: a review with extensions[J]. Operations Research, 1999, 47(2): 183-194. 被引量:1
  • 5林勇,马士华.基于提前期的通用件安全库存管理[J].系统工程,2003,21(1):71-75. 被引量:16
  • 6Hillier M S. Component commonality in multiple-period assemble-to- order systems[J].IIE Transactions, 2000,32: 755-766. 被引量:1
  • 7Yong Lin,Chen Kai. A study on guaranteed delivery time based inventory model of component commonality in assemble-to-order systems[C] // Proceedings of ICM ' 2007, Wuhan, China, 2007 : 1261-1268. 被引量:1

共引文献15

同被引文献21

  • 1林勇,马士华.基于提前期的多阶通用件库存模型[J].管理学报,2006,3(3):266-268. 被引量:3
  • 2刘蕾,罗华,唐小我.基于斯坦克尔伯格博弈的订货提前期决策研究[J].计算机集成制造系统,2007,13(7):1401-1405. 被引量:6
  • 3Wenting Pan, Kut C. So. Optimal Product Pricing and Com- ponent Production Quantities for an Assembly System under Supply Uncertainty[ J]. Operation Research, 2010,58 (6 ) : 1792 - 1797. 被引量:1
  • 4Shiming D, Candace A. Yano. Joint Production and Pricing Decisions with Setup Costs and Capacity Constrains [ J ]. Management Science, May 2006,52(5 ) :741 - 756. 被引量:1
  • 5Pangburn M. S,Stavrulaki E. Capacity and Price Setting for Dispersed, Time-sensitive Customer Segments[ J ]. European Journal of Operational Research, 2008, 184 ( 3 ) : 1100 - 1121. 被引量:1
  • 6Liu,L . M,Parlar M, Zhu, S.X. Pricing and Lead Time De- cisions in Decentralized Supply Chains[ J]. Management Sci- ence, 2007,53(5) :713 -725. 被引量:1
  • 7Shang, W. X, Liu, L. M. Promised Delivery Time and Capac- ity Games in Time-Based Competition[ J]. Management Sci- ence, 2011,57(3) :599 -610. 被引量:1
  • 8Teimoury, E, Modarres. M, Monfared, AK etc. Price, Deliv- ery Time and Capacity Decisions in an M/M/1 Make-to-or- der/service System with Segmented Market[J]. International Journal of Advanced Manufacturing Technology, 2011,57 ( 1 -4) :235 -244,. 被引量:1
  • 9Timothy L. Establishing Delivery Guarantee Policies[ J ]. Eu- ropean Journal of Operational Resear. ch, 2009,196 : 959 - 967. 被引量:1
  • 10Charnsirisakskul, Griffin P M, Keskinka K P. Pricing and Scheduling with Leadtime Flexibility [ J ]. European Journal of Operation Research ,2006,171 ( 1 ) : 153 - 69. 被引量:1

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部