期刊文献+

基于斯坦克尔伯格博弈的订货提前期决策研究 被引量:6

Ordering lead time decision based on Stackelberg game
下载PDF
导出
摘要 研究了供应链中供应商和零售商两级间的订货提前期决策问题。考虑现实中常见而研究较少的供应商决定交货时间和零售商决定订货量的订货过程,在提前期管理成本由上下游分担的条件下,建立了基于斯坦克尔伯格博弈的订货提前期模型,对比分析了供应商先动和零售商先动情形下的提前期和订货批量决策,说明了先行公布提前期对降低供应商成本和缩短供应链中的提前期是有利的。最后,通过算例对模型和结论进行了验证。 Ordering lead time decision between two-level of supplier and retailer in a supply chain was studied. The popular ordering process with few studies in which supplier decided ordering lead time and retailer decided order quantity was taken into consideration. On condition that lead time cost was shared by upstream and downstream, ordering lead time model based on Stackelberg game was constructed. Lead time and order quantity decision under supplier first and retailer first conditions were compared and analyzed. It was showed that the supplier as the leader could reduce the lead time and the supplier's cost. An calculation example was given to verify and illustrate the models and conclusions.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2007年第7期1401-1405,1418,共6页 Computer Integrated Manufacturing Systems
基金 教育部科学技术研究重点资助项目(105149) 高等学校博士学科点专项科研基金资助项目(20030614011) 四川省科技攻关资助项目(04SG011-021)。~~
关键词 提前期 供应链 斯坦克尔伯格博弈 库存成本 lead time supply chain Stackelberg game inventory cost
  • 相关文献

参考文献10

  • 1STALK G J,HOUT T M.Competing against time:how time-based competition is reshaping global markets[M].New York,N.Y.,USA:The Free Press,1999. 被引量:1
  • 2MARR N E.Do managers really know what service their customers require?[J].Journal of Physical Distribution and Logistics Management,1994,24(4):24-31. 被引量:1
  • 3SPEARMAN M Q,ZHANG R Q.Optimal lead time policies[J].Management Science,1999,42(5):290-295. 被引量:1
  • 4BLACKBURN J D.Time-based competition:the next battleground in American manufacturing[M].Homewood,Ill.,USA:Business One Irwin,1991. 被引量:1
  • 5LIAO C J,SHYU C H.An analytical determination of lead time with normal demand[J].International Journal of Operations & Production Management,1991,11(9):72-78. 被引量:1
  • 6BEIN-DAYA M,RAOUF A.Inventory models involving lead time as a decision variable[J].Journal of Operational Research Society,1994,45(5):579-582. 被引量:1
  • 7OUYANG L Y,CHANG Y C.Lot size reorder point inventory model with controllable lead time and set-up cost[J].International Journal of Systems Science,2002,33(8):635-632. 被引量:1
  • 8MOON I,CHOI S.A note on lead time and distributional assumptions in continuous review inventory models[J].Computers and Operations Research,1998,25(11):1007-1012. 被引量:1
  • 9HARIGA M,BEN-DAYA M.Some stochastic inventory models with deterministic variable lead time[J].European Journal of Operational Research,1999,113(1):42-51. 被引量:1
  • 10HARIGA M,BEN-DAYA M.Leadtime-reduction in a stochastic inventory system with learning consideration[J].International Journal of Production Research,2003,41(3):571-579. 被引量:1

同被引文献86

引证文献6

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部