摘要
长春地铁6号线南部新城西站采用“明挖现浇+明挖装配+盖挖逆作”组合式进行施工。以该车站为例,简要分析了车站的施工机械、施工工艺及控制要点以及装配式车站优缺点等及装配式车站的发展现状,并对装配式在地铁施工中的应用进行简要探讨,为类似工程施工提供了有益参考。
The south Xincheng West Station of Changchun Metro Line 6 is constructed by the combination of"open excavation and cast-in-situ+open excavation and assembly+cover excavation and reverse"construction.Taking Changchun Metro Line 6 as a project,the application of prefabricated in subway,construction,such as the main construction machinery,construction technology and control points,and the merits and demerits of the prefabricated station,was briefly discussed.In addition,the present situation of prefabricated station development was analyzed,which provides a useful reference for similar engineering construction.