摘要 以某超高层建筑为工程背景,选取CEB-FIP规范中混凝土材料的收缩徐变和强度模型,根据项目实际施工工序建立施工过程有限元模型。通过3种不同的施工过程模拟方案,得到了塔楼结构在各施工阶段的竖向变形情况,在对计算结果分析的基础上,得出了塔楼施工过程中竖向变形的发展规律。 Taking a super high-rise building as the engineering background,the shrinkage,creep and strength model of concrete materials in CEB-FIP specification are selected,and the finite element model of construction process is established according to the actual construction process of the project.Through three different construction process simulation schemes,the vertical deformation of the tower structure in each construction stage is obtained.Based on the analysis of the calculation results,the development law of the vertical deformation in the tower construction process is obtained.
作者 韩万鑫 李鸿晶 伍小平 李鑫奎 HAN Wanxin;LI Hongjing;WU Xiaoping;LI Xinkui(Nanjing Tech University,Nanjing,Jiangsu 211816,China;Shanghai Construction Group Co.,Ltd.,Shanghai 200080,China)
出处 《建筑施工》 2022年第4期823-826,共4页 Building Construction
关键词 超高层建筑 竖向变形 施工过程 数值模拟 super high-rise building vertical deformation construction process numerical simulation
  • 相关文献

参考文献6

二级参考文献36

共引文献238

同被引文献15

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部