期刊文献+

高层钢结构施工阶段实时监测及模拟分析 被引量:6

Real-time monitoring and simulation analysis over construction phase for a high-rise steel structure
原文传递
导出
摘要 天津诺德英蓝国际金融中心采用巨型柱-剪力墙核心筒-环形桁架-伸臂桁架结构体系.作为典型高层钢结构建筑,工程规模大,主体结构受力复杂,要求进行实时内力监测.介绍了内力监测系统工作原理和测点布置原则,运用数值模拟计算主体结构竖向位移,通过测点理论值和监测值对比分析,保证工程施工阶段安全性,为类似工程施工提供参考和借鉴. Tianjin Noble Winland International Financial Center adopts the structurel system composed of giant column,shear wall core tube,hoop truss and extended truss.As a typical high-rise steel structure,the project scale is quite large.In addition,the main structure accepts complex loads,so real-time monitoring is required.This paper introduced working principle of monitoring system and arrangement of measuring points. The vertical displacement of main structure was calculated by using numerical simulation.By comparing and analyzing theoretical value and monitoring value,we ensure the construction safety and provide a reference for similar engineering construction.
出处 《空间结构》 CSCD 北大核心 2016年第2期72-80,共9页 Spatial Structures
关键词 高层钢结构 巨型柱 钢板剪力墙 伸臂桁架 竖向位移 实时监测 数值模拟 high-rise steel structure giant column steal plate shear wall extended truss vertical displacement real-time monitoring numerical simulation
  • 相关文献

参考文献12

二级参考文献105

共引文献168

同被引文献33

引证文献6

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部