摘要
天津诺德英蓝国际金融中心采用巨型柱+剪力墙-核心筒+环形桁架+伸臂桁架结构体系,同时作为典型的施工时变结构体系,要求进行持续监测。介绍了施工过程中的监测方法和测点布置,通过理论值和监测值对比分析,保证施工阶段安全性,为本工程施工提供指导。
Tianjin Noble Winland International Financial Center adopts the giant columnshear wall core tubehoop trussextended truss structure system. As a typical time-varying structural system,continuous monitoring is required. The paper introduces monitoring methods and arrangement of measuring points during the construction,which ensures the construction safety and provides guidance for the project 's construction by comparing and analyzing with the theoretical value and monitoring value.
出处
《施工技术》
CAS
北大核心
2016年第14期86-89,共4页
Construction Technology
关键词
高层建筑
钢结构
钢板剪力墙
巨型柱
桁架
监测
数值模拟
tall buildings
steel structures
steel plate sheer wall
giant columns
trusses
monitoring