摘要 针对水锤计算中的图解法和水力仿真软件建模计算法的优缺点,笔者结合工程实例,采用这两种方法进行计算分析,并探讨其应用情况。通过分析得出:在项目建议书、可行性研究阶段,可采用图解法进行简易计算;在初步设计、施工图设计阶段,推荐采用水力仿真软件建模计算法进行精确的建模计算,合理布置水锤防护设备。该结果为不同设计阶段选择水锤计算方法提供参考。 In view of the advantages and disadvantages of graphic method and hydraulic simulation software modeling method in water hammer calculation,the author uses these two methods for calculation and analysis combined with engineering examples,and discusses their application.Through analysis,it is concluded that in the stage of project proposal and feasibility study,graphical method can be used for simple calculation;In the stage of preliminary design and construction drawing design,it is recommended to adopt hydraulic simulation software modeling calculation method for accurate modeling and calculation,and reasonably arrange water hammer protection equipment.The results provide a reference for selecting the calculation method of water hammer in different design stages.
作者 何义文 HE Yiwen(Guizhou Water Conservancy and Hydropower Survey and Design Institute Co.,Ltd.,Guiyang 550002,China)
出处 《红水河》 2022年第3期36-41,共6页 Hongshui River
关键词 水锤计算 泵站 图解法 水力仿真软件建模计算法 water hammer calculation pumping station graphical method hydraulic simulation software modeling calculation method
  • 相关文献

参考文献3

二级参考文献3

  • 1刘竹溪;刘光临.采站水锤及其防护[M]北京:水利电力出版社,1998. 被引量:1
  • 2金锥;姜乃昌;汪兴毕.停泵水锤及其防护[M]北京:中国建筑工业出版社,2004. 被引量:1
  • 3中国中元国际工程公司.Besharyk泵站设计说明书[M]北京:中国中元国际工程公司,2011. 被引量:1

共引文献46

同被引文献13

引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部