摘要
首都医科大学附属北京友谊医院顺义院区施工中,采用耗能型屈曲约束支撑与结构同步安装技术,在材料准备、吊装、固定等工序采取了一系列技术措施,取得了快速安装、节约工期、降低费用的良好效益。
Energy-consuming buckling restrained brace and structure simultaneous installation technique was used in construction of Shunyi branch of Beijing Friendship Hospital affiliated to Capital Medical University. A series of technical measures were adopted, such as material preparation, lifting and fixing, etc., realizing fast installation, short construction schedule and low construction cost.
作者
杜勇健
童思贤
李婷
张裕庆
黄业奇
DU Yong-jian;TONG Si-xian;LI Ting;ZHANG Yu-qing;HUANG Ye-qi(Beijing Urban Construction Group Co.,Ltd.,100088,Beijing,China)
出处
《建筑技术》
2022年第3期327-329,共3页
Architecture Technology
关键词
钢结构
钢筋桁架楼承板
屈曲约束支撑
同步安装
固定
steel structure
steel truss bearing floor
buckling restrained brace
simultaneous installation
fixing