BSG水电站位于非洲刚果(金)南部地区卢阿拉巴(Lualaba)河上,为引水式岸边地面厂房,场地地震基本烈度为Ⅵ度。结合厂址处地形地质、现场交通等条件对厂区枢纽各建筑物进行了合理布置,根据机电设备布置要求及场内交通需要,对各部位空间进行了优化设计。实践证明,该发电厂房布置在满足结构安全和功能需求的前提下,节约了工程投资,取得了较好的经济效益。
BSG Hydropower Station is located on the Lualaba River in southern DR.It is a diversion type powerhouse on the bank,and the basic seismic intensity of the site is grade VI.In combination with the topographical and geological conditions and on-site traffic conditions of the plant site,the buildings of the plant hub are arranged,and the space of each part is optimized according to the layout requirements of electromechanical equipment and on-site traffic needs.The practice shows that on the premise of meeting the structural safety and functional requirements,the powerhouse layout saves the project investment and obtains good economic benefits.
作者
孔宇田
王坤
周洲
唐腾飞
KONG Yu-tian;WANG Kun;ZHOU Zhou;TANG Teng-fei(Power China Guiyang Engineering Corporation Limited,Guiyang 550081,China)
出处
《云南水力发电》
2022年第2期114-118,共5页
Yunnan Water Power
关键词
BSG水电站
厂区枢纽布置
结构布置
整体稳定
BSG Hydropower Station
layout of plant complex
structural configuration
overall stability