图尔古松水电站采用河床式布置,对工程总体和发电厂房布置进行详细介绍,结合工程所处严寒环境和冬季来水少的特点,进行了防冰冻设计和采用大小机组组合设计,给类似工程提供借鉴。
The river bed arrangement is adopted in Tulgusong Hydropower Station. The overall project and the house layout of the power plant are introduced in detail. Combined with the cold environment of the project and the characteristics of less water coming from winter, the anti-freezing design and the combination design of large and small units are carried out. To provide refer-ence for similar projects.