摘要
针对当前修船企业存在粗放性和滞后性管理等问题,提出以修船工程单为核心,利用信息化技术进行整合,构建企业修船工程单管理系统模型;以数据库共享为基础,实现高效协同的录单模式,规范修船工程单信息流传流程,监控工程项目运转,为企业后续管理优化决策提供数据支撑。
In view of the problems of extensive and lagging management in current ship repair enterprises,a model of enterprise ship repair engineering order management system is put forward based on the ship repair engineering order as the core and the integration of information technology.With database sharing as its basics,the efficient and collaborative order recording mode are realized,the process of ship repairing engineering order information flow is standardized,the operation of engineering projects is supervised.It provides data support for the follow-up management and optimization decision for enterprises.
作者
朱安庆
陈加伟
朱海
姚飚
ZHU Anqing;CHEN Jiawei;ZHU Hai;YAO Biao(School of Naval Architecture and Ocean Engineering,Jiangsu University of Science and Technology,Zhenjiang 212003,Jiangsu,China;Jiangsu Modern Shipbuilding Technology Co.,Ltd.,Zhenjiang 212003,Jiangsu,China)
出处
《船舶工程》
CSCD
北大核心
2021年第10期124-127,165,共5页
Ship Engineering
基金
工信部(联装[2016]545号)项目经费资助。
关键词
修船
工程单管理
信息化
数据库共享
ship repairing
engineering order management
informatization
database sharing