期刊文献+

应力异常区复合软岩大巷支护研究 被引量:3

Study on Composite Soft Rock Roadway Support in Abnormal Stress Area
下载PDF
导出
摘要 为解决成庄矿五盘区北翼大巷矿压显现强烈,补强效果差等问题,提出采用高强锚杆锚索配合滞后注浆支护技术,并进行了现场试验。试验结果表明,采用该设计后巷道迎头80 m范围顶底板移近量峰值为502 mm,两帮移近量峰值为397 mm,巷道变形量得到有效控制,有效保证了巷道的稳定性。 In order to solve the problems of strong mining pressure and poor reinforcement effect in the north wing roadway of the 5th panel of Chengzhuang Coal Mine,this paper proposed the use of high-strength bolts and cables with lagging grouting support technology,and field tests were carried out.The test results showed that after adopting this design,the peak value of the approa-ching amount of the roof and floor of the roadway heading 80 m was 502 mm,and the peak value of the approaching amount of the two sides was 397 mm,the deformation of the roadway was effectively controlled,and the stability of the roadway was effec-tively ensured.
作者 倪亚军 李锋刚 NI Yajun;LI Fenggang(Sima Coal Industry Co.,Ltd.,Lu'an Chemical Group of Shanxi,Changzhi 047105,Shanxi,China;Shanxi Institute of Mechanical and Electrical Engineering,Changzhi 046011,Shanxi,China)
出处 《能源与节能》 2021年第12期12-14,共3页 Energy and Energy Conservation
基金 山西潞安化工集团科研开发项目(2019140408000076)。
关键词 应力异常 软岩巷道 滞后注浆 abnormal stress soft rock roadway lagging grouting
  • 相关文献

参考文献3

二级参考文献25

共引文献25

同被引文献21

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部