摘要
讨论了某城市双向6车道市政道路长距离下穿多条交通线路案例中,三角支架在U型槽地道侧墙施工过程中的应用,并揭示了运用BIM技术进行项目管理可以有效提升管理技术、促进ISO全流程质量管理体系的实现过程。该过程也可以有效促进三角支架的全部零件加工过程,使其得到了高标准加工和全寿命管理,实现了三角支架加工与施工的标准化。
In the case of a two-way 6-lane municipal road crossing multiple traffic lines for a long distance,the application of triangular support in the construction of U-shaped tunnel side wall is discussed.The application of BIM in project management can effectively improve the management technology and promote the realization process of the whole process quality management system of ISO.The processing process of all parts of the triangle support can also be effectively promoted.It is processed to high standard and managed in life-cycle.The standardization of processing and construction of the triangle support is realized.
作者
邱继增
Qiu Jizeng(The Fifth Engineering Co.,Ltd.,of China Railway 18th Bureau Group,Tianjin 300451,China)
出处
《市政技术》
2021年第5期143-146,共4页
Journal of Municipal Technology
关键词
公路隧道
U型槽
三角支架
侧墙浇筑
highway tunnel
U-shaped groove
triangular support
side wall pouring