期刊文献+

关于施工许可与工程竣工验收备案时间过长问题的探讨 被引量:1

Discussion on Overlong Registration Time for Construction Permit and Project Completion Acceptance
下载PDF
导出
摘要 为更好地提高建设工程管理,加快工程审批效能,针对建设工程施工中在办理施工许可与工程竣工验收备案手续时,办理时间过长等相关问题进行了分析。给出了如何加快实施建设工程施工许可与竣工验收备案制的相应建议及具体措施,以期为类似工程提供参考。 To better improve the management of construction projects and speed up the efficiency of project approval,the problems related to the overlong processing time when handling the construction permit and project completion acceptance registration procedures during project construction are analyzed.The corresponding suggestions and specific measures on how to speed up the implementation of construction permit and completion acceptance registration system of construction projects are given,so as to provide reference for similar projects.
作者 曾晖 蒙立强 白东方 刘青青 蒋黎明 ZENG Hui;MENG Liqiang;BAI Dongfang;LIU Qingqing;JIANG Liming(Guangxi Construction Engineering Group,the Fourth Construction Limited Liability Company,Guilin,Guangxi 541004,China)
出处 《建筑施工》 2021年第4期732-734,共3页 Building Construction
关键词 建设工程 施工许可 竣工验收 备案制 construction project construction permit completion acceptance registration system
  • 相关文献

参考文献6

二级参考文献14

共引文献15

同被引文献3

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部