多连跨高大空间网架的吊装施工关键技术 被引量:2

Key Technology for Hoisting Construction of Multi-span Large Space Grid
下载PDF
导出
摘要 为有效解决新型钢结构网架吊装工期长、成本高、吊装精度不易控制等问题,结合工程实际,介绍了起步单元榀吊装、平衡控制、应力消解等施工关键技术。实施结果表明:以上关键技术的运用,避免了吊装过程中吊车倾覆、网架失稳、拉杆拉断等安全事故,节约了吊装时间,降低了施工成本。 To effectively solve the problems of long construction period,high cost and difficulty of controlling hoisting precision of the new steel structure grid,combined with the engineering practice,the key technologies such as hoisting of starting truss units,balance control and stress elimination are introduced.The implementation results show that the application of these key technologies can avoid safety incidents of crane overturning,grid instability,pull rod breaking and so on,save hoisting time and reduce construction cost.
作者 乔天顺 QIAO Tianshun(Anyang People’s Hospital,Anyang,Henan 455000,China)
机构地区 安阳市人民医院
出处 《建筑施工》 2020年第10期1855-1857,共3页 Building Construction
关键词 多连跨 空间网架 吊装施工 应力消解 multi-span space grid hoisting construction stress elimination
  • 相关文献

参考文献5

二级参考文献6

共引文献31

同被引文献8

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部