期刊文献+

多跨预应力混凝土连续箱梁桥合龙段施工技术 被引量:2

The construction technology of the closure section of the multi span prestressed concrete continuous box girder bridge the long-span continuous box girder
下载PDF
导出
摘要 桥梁工程合龙段施工过程复杂、施工难度大、施工要求高,是桥梁工程施工中的重要施工环节。以某桥梁工程为例,对连续梁桥合龙段施工技术和体系转换进行分析,并提出了合龙段施工中应注意的要点,为连续梁合龙段施工质量控制提供参考。 The construction process of bridge closure section is complex,difficult and demanding,which is an important construction link in bridge construction.Taking a bridge project as an example,this paper analyzes the construction technology and system transformation of the closure section of the continuous beam bridge.Finally,it puts forward the key points that should be paid attention to in the construction of the closure section,which provides a reference for the construction quality control of the closure section of the continuous beam.
作者 张同文 Zhang Tongwen(Hunan High Speed Railway Vocational and Technical College,Hengyang 421002,China)
出处 《山西建筑》 2020年第21期135-137,共3页 Shanxi Architecture
关键词 桥梁建设 连续箱梁 合龙段 体系转换 施工技术 bridge construction continuous box girder closure section system transformation construction technology
  • 相关文献

参考文献3

二级参考文献7

共引文献3

同被引文献11

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部