摘要 随着配电网中分布式能源的渗透比例不断升高,其间歇性及波动性特点极大降低了配电网的安全性,而储能系统可有效缓解这一情况。从成本分析角度研究蓄电池储能配置方法。首先对蓄电池的充放电过程进行优化;然后综合考虑储能政策补贴、电价补贴、投资成本及其附加效益,建立了以配电网蓄电池储能系统净收益最大为目标的投资收益模型;最后,将差分算法与内点法相结合,对模型进行求解。通过算例,分析比较了不同类型蓄电池的配置方案及相应收益情况,结果验证了所提配置方法的可行性。 With the increase of the proportion of distributed energy integration in distribution network,the intermittence and fluctuation greatly reduce the safety of the distribution network,but energy storage system can effectively improve the safety.This paper focuses on the method of battery energy storage configuration based on cost analysis.Firstly,the charging and discharging process of the battery is optimized.Then an investment income model based on objection function with the maximum net income of battery energy storage system in the distribution network is established,considering the policy subsidy for the energy storage,electricity price subsidy,investment cost and additional benefits.Finally,difference algorithm is combined with interior point method to solve the model.The analysis of examples with different types of batteries and their corresponding benefits verifies the feasibility of the proposed configuration method.
作者 熊宁 朱文广 杨为群 周博文 XIONG Ning;ZHU Wenguang;YANG Weiqun;ZHOU Bowen(State Grid Jiangxi Economic Research Institute,Nanchang 330043,China;College of Information Science and Engineering,Northeastern University,Shenyang 110819,China)
出处 《智慧电力》 北大核心 2019年第10期51-55,111,共6页 Smart Power
基金 国家自然科学基金资助项目(61703189)~~
关键词 成本分析 配电网 蓄电池储能系统 净收益 cost analysis distribution network battery energy storage system net income
  • 相关文献

参考文献10

二级参考文献162

  • 1王海超,鲁宗相,周双喜.风电场发电容量可信度研究[J].中国电机工程学报,2005,25(10):103-106. 被引量:134
  • 2张步涵,曾杰,毛承雄,金玉洁,王云玲.电池储能系统在改善并网风电场电能质量和稳定性中的应用[J].电网技术,2006,30(15):54-58. 被引量:228
  • 3王绵斌,谭忠富,张蓉,王成文,曹福成,李晓军.基于“增量法”下的电网投资风险评估模型[J].电工技术学报,2006,21(9):18-24. 被引量:29
  • 4SORENSEN P, CUTULULIS N A, VIGUERAS- RODRIGUEZ A, et al. Power fluctuations from large wind farms[J].IEEE Trans on Power Systems, 2007, 22(3): 958- 965. 被引量:1
  • 5CHANGLING L, BOON-TECK O. Frequency deviation of thermal power plants due to wind farms[J]. IEEE Trans on Energy Conversion, 2006, 21(3):708-716. 被引量:1
  • 6CHANGLING L, FAR H G, BANAKAR H, et al. Estimation of wind penetration as limited by frequency deviation[J]. IEEE Trans on Energy Conversion, 2007, 22(3) : 783-791. 被引量:1
  • 7FOX B, FI.YNN D, BRYANS L, et al. Wind power integration: connection and system operational aspects[M]. London, UK: Institution of Engineering and Technology, 2007. 被引量:1
  • 8Tohoku Electric Power Company. Requirements of grid connect[EB/OL]. [2014 01-12]. http://www, tohoku epco. co. jp/ ICSFiles/ afieldfil e/ 2011/11/16 /11111601_wp09 t.pdf. 被引量:1
  • 9GB/T19963-2011 风电接入电力系统技术规定[S].北京:中国质检出版社,2011. 被引量:1
  • 10ERCOT. PRR771-ramp rate limitation of 10% per minute of on line installed capacity for wind-powered generation resources [EB/OL]. [2013-12-08]. http://www, ercot, corn/rnktrules/ issues/prr/750-774/771. 被引量:1

共引文献522

同被引文献116

引证文献8

二级引证文献113

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部