期刊文献+

悬臂式综掘机干涉问题分析及解决措施 被引量:3

Analysis and solution of interference problem of boom-type roadheader
下载PDF
导出
摘要 随着矿井现代化、机械化水平的不断提升,悬臂式综掘机在矿井中的应用不断增加,山西某矿所采用的EBZ-120悬臂综掘机经常出现干涉问题,影响矿井巷道掘进。基于此,在明确悬臂综掘机结构组成的基础上,对悬臂综掘机出现的干涉问题进行分析,并提出了相应的解决改造措施。实践结果表明,对综掘机进行改造后,综掘机的干涉问题得到了解决,巷道掘进速度提高了将近50%,设备的综合故障投入下降约25%,有效地保证了矿井巷道的高效掘进。 With the continuous improvement of mine modernization and mechanization level,the application of boom-type roadheader in mine is increasing.The EBZ-120 boom-type roadheader used in coal mine often has interference problems,which affect the mine roadway excavation.Based on the structure composition of the boom-type roadheader,the interference problems of the boom-type roadheader were analyzed,and the corresponding solutions were put forward.Practice shows that the interference problem of the reformed boom-type roadheader was solved,the tunneling speed was increased by nearly 50%,and the comprehensive failure rate of the equipment was reduced by about 25%,which effectively ensures the efficient tunneling of the mine roadways.
作者 靳小蕾 JIN Xiao-lei(Huipodi Coal Mine,Fenhe Coking Coal Co.,Ltd.,Huozhou Coal and Electricity Group Co.,Ltd.,Linfen 041600,China)
出处 《陕西煤炭》 2019年第5期79-81,68,共4页 Shaanxi Coal
关键词 悬臂综掘机 干涉 问题分析 解决措施 boom-type roadheader interference problem analysis,solution
  • 相关文献

参考文献8

二级参考文献49

共引文献69

同被引文献14

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部