期刊文献+

高应力回采巷道底鼓防治技术研究 被引量:1

Study on Prevention Technology of Floor Heave in High Stress Mining Roadway
下载PDF
导出
摘要 以311307工作面为研究对象,分析了巷道发生底鼓的机理,并采用FLAC3D模拟巷道底板采用卸压槽及注浆锚杆后底板应力、位移及塑性区情况。根据模拟结果可知,采用联合措施后底板最大底鼓量为105mm。此外,分别设计了卸压槽及注浆锚杆参数,通过监测底鼓量对治理效果进行检验。根据监测结果可知,联合治理措施取得了良好效果。 Taking 311307 working face as the research object, the mechanism of the bottom drum in the roadway was analyzed. The FLAC3D was used to simulate the stress, displacement and plastic zone of the backing plate and the backing plate of the grouting anchor. According to the simulation results, the joint was adopted. After the measure, the maximum bottom drum of the bottom plate was 105mm. The parameters of pressure relief groove and grouting an. chor were designed separately. The effect of the bottom drum was monitored by monitoring the bottom drum. Accord. ing to the monitoring results, the joint treatment measures had achieved good results.
作者 张正萌 张忠玉 王新 ZHANG Zhengmeng;ZHANG Zhongyu;WANG Xin(Inner Mongolia Huangtao Legai Coal Co., Ltd. Bayan Gaole Coal Mine,Erdos Inner Mongolia 017312)
出处 《河南科技》 2019年第22期104-106,共3页 Henan Science and Technology
关键词 底鼓 卸压槽 注浆锚杆 底板位移 bottom drum pressure relief groove grouting anchor floor displacement
  • 相关文献

参考文献6

二级参考文献40

共引文献15

同被引文献18

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部