为解决传统施工升降机需多次拆装才能满足异形结构施工需要的难题,提出异形建筑施工升降机超远距离附着施工关键技术,包括施工升降机附墙加长架模拟受力分析和施工升降机Ⅱ形附墙加长架超远距离附着施工技术。通过异形建筑施工升降机超远距离附着技术,项目成功解决异形结构施工升降机的安装难题,减少现场结构更改施工工程量,缩短工期、节约成本。
In order to solve the problem that traditional construction elevator is needed to be disassembled and assembled many times to meet the construction needs of special-shaped structures, the key technology for super-far distance attached construction of special-shaped construction elevator is put forward. The key technology including construction elevator attached extended simulated stress analysis and construction elevator Ⅱ attached extended kop attached construction technology. By using the key technology of super-far distance attached of special-shaped construction elevator, the installation problem of special-shaped structure construction elevator is successfully solved, the amount of construction work of the site structure change is reduced, the time limit is shortened , and the cost is saved.
作者
刘旭冉
任志平
侯春明
赵长江
董欢欢
陈春辉
LIU Xuran;REN Zhiping;HOU Chunming;ZHAO Changjiang;DONG Huanhuan;CHEN Chunhui(China Construction Third Engineering Bureau Group Co.,Ltd.Chengdu Branch,Chengdu,Sichuan 610041 ,China)
出处
《施工技术》
CAS
2019年第18期8-10,共3页
Construction Technology
关键词
高层建筑
异形结构
施工升降机
远距离附着
施工技术
tall buildings
special-shaped structure
elevators
super-far distance attached
construction