综采工作面快速过构造工艺研究 被引量:2

Study on the Technology for Quickly Passing the Construction at the Fully Mechanized Working Face
下载PDF
导出
摘要 综采工作面过构造期间严重制约着采煤工作面的正常生产。因此,为保证采煤工作面快速通过构造区域、保证原煤产量,在采煤工作面过断层期间通过使用乳化液钻机实施深孔,应用松动爆破技术增加岩石裂隙。并合理优化爆破参数及工艺流程,使得采煤工作面顺利通过断层。分析了新型乳化液钻机的使用,探讨了爆破方案的设计及爆破效果。 The normal production was seriously restricted when passing the construction at the fully mechanized working face.Therefore,to ensure the quick pass and guarantee the output of raw coal,deep drilling was adopted by using emulsion motor whenpassing the fault and loose blasting technology was applied to increase the rock fracture.This paper analyzed the use of themodern emulsion motor and explored the design of the scheme of blasting and its effect.
作者 田鹏 TIAN Peng(Changping Coal Industry Co., Ltd. in Shanxi Province, Gaoping 046700,Shanxi, China)
出处 《能源与节能》 2017年第11期31-32,34,共3页 Energy and Energy Conservation
关键词 深孔 松动爆破 优化工艺 乳化液钻机 deep hole loose blasting optimization of process emulsion motor
  • 相关文献

参考文献4

  • 1钱鸣高,石平五主编..矿山压力与岩层控制[M].徐州:中国矿业大学出版社,2003:373.
  • 2戴俊编著..岩石动力学特性与爆破理论[M].北京:冶金工业出版社,2002:225.
  • 3李龙生.综放工作面采用深孔爆破过陷落柱技术[J].煤矿现代化,2016,25(1):68-69. 被引量:6
  • 4王玉杰主编..爆破工程[M].武汉:武汉理工大学出版社,2007:324.

共引文献5

同被引文献10

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部