综采工作面深孔爆破过陷落柱工艺优化及研究应用 被引量:5

Technology Optimization and Research Application of Medium Deep Hole Blasting Through Collapse Column in Fully Mechanized Mining Face
下载PDF
导出
摘要 陷落柱是影响采煤工作面正常开采的较大因素,官地矿通过用中深孔爆破技术破坏原有的陷落柱结构,极大地提高了工作面回采效率,优化了施工工艺,降低了职工的劳动强度,保护了综采设备,提高了矿山生产效率,值得在包含有陷落柱的工作面进行推广使用。 Collapse column is a big factor affecting the normal mining of coal mining face.Guandi Coal Mine destroyed the original collapse column structure by using medium deep hole blasting technology,which greatly improved the mining efficiency of working face,optimized the construction technology,reduced the labor intensity of workers,protected the fully mechanized mining equipment,and improved the production efficiency of the mine.It is worth promoting in the working face with collapse column use.
作者 张晋 Zhang Jin(Guandi Mine of Xishan Coal Electricity Group Co.,Ltd.,Shanxi Coking Coal Group Co.,Ltd.,Taiyuan Shanxi 030024)
出处 《山西冶金》 CAS 2020年第6期155-157,共3页 Shanxi Metallurgy
关键词 中深孔爆破 陷落柱 分段装药 medium deep hole blasting collapse column sectional charging
  • 相关文献

参考文献3

二级参考文献3

共引文献17

同被引文献29

引证文献5

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部