摘要
地铁车站机电系统管线涉及专业多、安装面分散、协调量大,是进度、安全、质量控制的重难点。本文针对某非标准地铁车站,阐述了通过组织各专业管线综合规划布局并利用BIM技术开展深化设计,充分合理利用地下空间、避免管线干涉碰撞,极大提高安装施工效率,并为后期运营维护检修提供便利。
The mechanical and electrical system pipeline of the metro station involves many specialties,during the construction,the installation surface is scattered and the coordination is difficult.It is the key point and difficulty of the schedule,safety and quality control.In this paper,it is described that the pipeline of a off-standard metro station,by organizing pipeline layout with various majors in advance,promoting detailed design in a virtual environment by building3-D model with BIM,The underground space is fully and rationally utilized,the interference of pipeline collision is avoided,improving the efficiency of the installation greatly,and providing the foundation for maintenance in the metro operation.
出处
《智能城市》
2017年第9期32-34,共3页
Intelligent City
关键词
非标地铁站
综合管线
设计
BIM
off-standard Metro Station
piping systems
design
BIM