基于工作包/派工单的船舶总组/搭载仿真与优化

Ship Pre-erection/Erection Simulation and Optimization Based on Work Package/Work Order
下载PDF
导出
摘要 针对某系列散货船总组/搭载区域工作包/派工单(WP/WO)作业分解实际,对总组/搭载过程的基础数据、生产工艺和流程、设施设备和资源等进行系统而全面的梳理与分析,建立基于WP/WO作业计划的总组/搭载仿真模型。实际生产前在虚拟环境中进行评估,提前发现潜在的问题,使设计、生产和管理更加准确、高效,确保生产有条不紊地进行。实例分析结果表明,面向WP/WO作业计划的总组/搭载仿真是行之有效的,可为精细化管理提供决策依据。 According to the work breakdown practice of work package/work order(WP/WO)in the pre-erection/erection area,this paper carries out systematic and comprehensive analysis on the basic data,production technology and process,facility and equipment as well as the resources during pre-erection/erection,and establishes the pre-erection/erectionsimulation model based on WP/WO plan.Assessment is performed in a virtual environment before production to revealpotential problem and thus to make the design,production and management more accurate,effective and in a moreorderly way.Analys is of a practical example shows that the pre-erection/erection simulation based on WP/WO work planis an effective new technology that provides decision basis for fine management.
作者 朱明华 单小芬 毛申飞 朱仁贵 ZHU Ming-hua;SHAN Xiao-fen;MAO Shen-fei;ZHU Ren-gui(Jiangnan Shipyard (Group) Co., Ltd., Shanghai 201913, China;CSSC Huangpu Wenchong Shipbulding Co., Ltd., Guangzhou 510715, China)
出处 《船舶与海洋工程》 2017年第2期72-77,共6页 Naval Architecture and Ocean Engineering
基金 国防科工局基础科研项目(A0720132011)
关键词 工作包/派工单 总组/搭载 仿真 优化 WP/WO pre-erection/erection simulation optimization
  • 相关文献

参考文献3

二级参考文献11

共引文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部