摘要
复杂水文地质条件下装配式管廊防水的工作关系到装配式管廊的安全性、可靠性和稳定性及各种管线的正常使用,是管廊项目施工的关键技术问题。以某装配式电力管廊项目,通过理论分析和现场施工相结合的方法,对某装配式电力管廊项目防水技术的施工流程、施工工艺和关键操作要点进行研究,并针对复杂水文地质条件下装配式管廊防水的施工困难点进行分析,提出相应的处理措施,从而为类似工程提供借鉴。
Waterproof performance of assembled pipe gallery under complex hydrogeological conditions is a key technique used in construction of pipe gallery project, because it is related to the safety, reliability and stability of the assembled pipe gallery and normal service of various pipelines. Theoretical analysis and field construction were combined together to study the construction flow, process and key points of an assembled power pipe gallery project. The construction difficulties of assembled pipe gallery under complex hydrogeological conditions were analysis and relevant treatment measures were proposed, to provide references for similar projects.
出处
《建筑技术开发》
2018年第10期66-67,共2页
Building Technology Development
关键词
复杂水文地质
装配式管廊
防水技术
complex hydrogeology
assembled pipe gallery
waterproof technique