6Tiong RLK, Alum J. Final negotiation in competitive BOT tender[J]. Journal of Construction Engineering and Management, 1997, 123(1): 6-10 被引量:1
7Lam K C, Wang D, Lee P T K, et al. Modeling risk allocation decision in construction contracts [J]. International Journal of Project Management, 2007, 25 (5): 485-493 被引量:1
8Rutgers J A, Haley H D. Project risks and risk allocation [J]. Cost Engineering, 1996, 38(9): 27-30 被引量:1
9Groupe Eurotunnel. Our History lOLl. http: //www. eurotunnel.com/ukcP3Main/ukcCorporate/ukcAboutUs/ukc OurHistory/ukpHistory.htm 被引量:1
10Francis W A. The channel tunnel: a case study [R]. Washington, D C: National Defense University, 1993 被引量:1