摘要
当前经济环境压力下,PPP模式的大力推进指明了我国大型建筑企业发展转型的方向,通过分析传统市场下我国大型建筑企业的发展瓶颈,进而指出其参与PPP项目存在的不足。并在此基础上,从投资结构、融资结构和回报机制3个核心方面着手研究大型建筑企业PPP项目的运作模式及其选择流程,辅以武汉光谷火车站东、西广场项目作为实际案例进行应用和验证。
Under the current economic environment pressure, the vigorous promotion of PPP mode points out the direction of the transformation and the development of Chinese large-scale construction enterprises. This paper analyzes the bottleneck in the development of large-scale construction enterprises in the traditional market, and points out the shortages of the participation in PPP projects. On the basis of this, from the three core aspects: investment structure, financing structure and reward mechanism, this paper studies the operation mode and select process of PPP projects of the large-scale construction enterprises. Besides, this paper uses the East and West Square Project of Optical Valley Railway Station as real case for the application and verification.
出处
《施工技术》
CAS
北大核心
2017年第9期107-112,130,共7页
Construction Technology
关键词
项目管理
PPP模式
运作模式
投资结构
融资结构
研究
project management
PPP mode
operation mode
investment structure
financing structure
study