摘要 洛甫水库修建于20世纪90年代,大坝为均质土坝,最大坝高43.00m。根据现场踏勘可知,洛甫水库坝基存在多处渗漏,局部渗漏严重,对大坝的安全稳定运行造成了不利影响,因此,对大坝进行除险加固势在必行。论文主要从灌浆原材料、灌浆施工措施及现场质量控制等方面简要介绍大坝坝基帷幕灌浆施工质量监理控制要点。 Luofu reservoir was built in 1990 s, the dam is homogeneous earth dam, the height of dam is 43.00 m. According to the field survey,there are many leakages in the dam foundation of Luofu reservoir dam, and local leakage is serious, has influence on the safety operation of the dam, therefore, the dam reinforcement is imperative. The main points of grouting quality control of dam foundation curtain grouting are introduced in this paper, including grouting raw material, grouting construction measures and site quality control.
作者 姜兴
出处 《中小企业管理与科技》 2017年第19期33-34,共2页 Management & Technology of SME
关键词 洛甫水库 大坝帷幕灌浆施工 质量控制要点 Luofu reservoir construction of dam curtain grouting quality control points
  • 相关文献

参考文献4

二级参考文献4

共引文献14

同被引文献8

引证文献4

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部