摘要
结合绿地中心·蜀峰468项目T1塔楼超厚底板大体积混凝土浇筑实例,主要介绍了BIM技术在底板钢筋深化设计中的运用、大体积混凝土配合比设计优化、混凝土浇筑施工组织和温度及应力应变监测等几个方面采取的技术措施,取得了良好的实际效果。
Based on mass concrete construction of super thick and large raft of T1 tower in Greenland Center Shufeng 468 high-rise building, this paper mainly introduces the BIM technology in the use of raft reinforcement deepen design, mass concrete with the proportion design optimization, concrete pouring construction organization and temperature and stress strain monitoring, which obtains good effect.
出处
《施工技术》
CAS
北大核心
2017年第6期1-7,共7页
Construction Technology
关键词
高层建筑
混凝土
底板
配合比
裂缝控制
施工技术
tall buildings
concrete
raft
mix proportion
cracks control
construction