摘要
在借鉴发达国家高速铁路发展成功经验基础上,结合我国国情路情,以系统科学原理及现代管理理论为指导,探索形成中国高速铁路建设项目标准化管理思路,并在实践中形成了高速铁路建设项目一体化管理模式,通过构建高速铁路建设标准化管理下的一体化运行机制、推行高速铁路建设与铁路运输接口的一体化管理、开展高速铁路成套技术一体化系统创新等途径,统筹高速铁路建设和运营两大领域,强化系统内外协调运作,以整体推进中国高速铁路快速发展,实现《中长期铁路网规划》目标。
Based on the successful experience of developed countries in the development of high-speed railway^ in combination with national conditions and railway conditions of China, the concepts on the standardized management of high-speed railway construction projects in China have been explored and taken shape, under the guidance of the principle of systematic science and the theory of modern management. As a result, the integrated management mode for high-speed railway construction projects has been formed in practical application. Through the establishment of the integrated operation mechanism under the standardized management of high-speed railway construction, promotion of the integrated management of the interface between high-speed railway construction and railway transport, and implementation of the integrated system innovation for complete set of high-speed railway technologies, efforts have been made in overall planning of the construction and operation of high-speed railway and consolidation of coordinated operation within and outside the railway system, in order to promote the rapid and overall development of high-speed railway in China and to achieve the goals of the “Medium and Long term Plan of Railway Network”.
出处
《铁道学报》
EI
CAS
CSCD
北大核心
2016年第11期1-8,共8页
Journal of the China Railway Society
基金
中国铁路总公司科技研究开发计划(2013G003-A-1
Z2014-T002)
关键词
中国高速铁路
一体化管理
创新
实践
high-speed railway in China
integrated management
innovation
practice