4Na Liu, Gaoweng Sheng, Kexiong Tan. Decision on Maintenance Period for Power Transformer based on Monte Carlo Simulation Reliability[C]//Proceedings of the 7th Internatiomal Conference on Properties and Ap- plications of Dielectric ]Materials. June, 1-5,2003, Nogo- ya: 479-482. 被引量:1
5C. Richard Cassady, Ilyas Mohammed Iyoop. A Ge- neric Model of Equipment Availability Under Imperfect Maintenance[J]. IEEE TRANSACTION ON RELIA- BILITY, 2005,54(4):564-571. 被引量:1
6Hairong Sun, Jame J. Han. The Failure of MTTF in Availability Evaluation [J]. IEEE 2002 PROCEEDINGS Annual RELIABILITY and MAINTAINABILITY Symposium,2002:279-284. 被引量:1