期刊文献+

南昌轨道交通3号线绳金塔站局部线、站位方案研究 被引量:4

Study on Local Route Adjoining to and Location of Shengjinta Station:a Transfer Station of Nanchang Rail Transit System in Old Urban Area
下载PDF
导出
摘要 绳金塔站是南昌轨道交通3,4号线的换乘车站,位于老城区旧城改造范围内,绳金塔站站位由3,4号线换乘线路路由及换乘型式确定。在工程可行性研究阶段根据3,4号线路由和绳金塔站的换乘型式研究了3种站位方案,并分析了各方案的优、缺点。综合老城区车站及区间的实施难度、工程协调量、成本和房屋拆迁量等因素,文章最后推荐绳金塔站的换乘方案为双层上、下平行换乘,稳定了3,4号线局部线、站位方案,为类似老城区旧城改造范围内车站的换乘方案研究提供借鉴。 Shengjinta station, which is a transfer station between Line 3 and Line 4 of Nanchang rail transit system, is located in the to-be-rebuih old urban area of Nanchang city. The location of Shengjinta station depends on the transfer route and transfer type between Line 3 and Line 4. In the feasibility study stage of the project, 3 transfer route schemes and 3 transfer types between Line 3 and Line 4 are studied. In the paper, the study on the transfer route schemes and transfer types are illustrated, and the advantages and disadvantages of the mentioned transfer route schemes and transfer types are analyzed. Considering the implementation difficulties, engineering coordination workload, cost, number of buildings to be dismantled, etc. , the authors recommend that the double-floor parallel transfer mode should be adopted for Shengjinta station. In this way, the final route of Line 3 and Line 4 and the location of Shengjinta station are determined. The paper can provide reference for similar projects in the future.
作者 张文正 赵狮
出处 《隧道建设》 北大核心 2015年第7期698-708,共11页 Tunnel Construction
关键词 城市轨道交通 建设规划 控制点 线、站位方案 换乘型式 urban rail transit planning control point scheme of route and station location transfer type
  • 相关文献

参考文献10

二级参考文献14

共引文献144

同被引文献31

引证文献4

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部