摘要
针对调车机作业复杂的站场情况,介绍了无线调车机车信号和监控系统的3种控制方案,通过各个控制方案对比分析,综合考虑维护成本、工程造价、施工难度等因素,选择最优化的控制方案。
In consideration of the complex situations of shunting train operation, we introduce three control solutions for STP. The best solution are determined by analyzing these solutions in term of maintenance cost, construction cost, the difficulties of construction and some other fac-tors.